Delivered to Rep. Raul Grijalva and Rep. Gabrielle Giffords 4/5/2007 This is a report on considerations that I feel are relevant to assessment of the projected Rosemont mining operation—and any mining operation in Ariazona. I am not against mining per se—in areas that are already wastelands. There are plenty of wastelands in the southwest. Why create another one? Mining impacts the whole eco-system in ways that we cannot imagine. Mining needs to be done where there is plenty of water and no population of humans, animals or plants. I once teased the manager of Phelps Dodge Sierrita —you guys should have bought the whole state of Arizona, put up fences and stated: “This is the nation’s metal supply—do not approach, we are going to turn it into a toxic, devastated wasteland.” But here we all are, and so they have to deal with this reality. Pit mining is a very dirty business—I refer you to photos taken from the ADEQ files for Sierrita. It’s nothing at all like the few holes that pock the Santa Ritas now, which I visit regularly to “get away from it all.” The company’s estimate is that they will be moving 440 millions tons of ore – leaving 99% of it behind in waste dumps and tailings impoundments, added to the over-burden to get down to the mineral ore gives a sum of some 1 billion tons. In a law suit in 2003, Judge Henry H. Kennedy, Jr., U.S. District Court of the District of Columbia, ruled that the Bureau of Land Management has the authority to and must prevent substantial damage to public lands under the undue or unnecessary degradation (UUD) standard of the Federal Lands Management and Policy Act (FLPMA).
This degrading of public lands in a way that is non-recoverable is certainly a relevant issue.
Further, in August, 2006 an Oregon judge over-ruled a mining company’s claim to devastate land by mining. Land they got for $5 an acre and for which they will pay no royalties to the “public” who “owns” the land. The Forest Service does not have to allow mining on Public Land.
Keep in mind that in 1872 when the Mining Law was passed it was intended to encourage settlement, just like the Homestead Act. The small holes dotting the hills of the Santa Ritas are evidence that the miners were all working independently with pick, shovel and a few sticks of dynamite. Principal Considerations:
Recommendation: I recommend that we save this type of low-grade ore deposits that require waste rock dumps and tailings impoundments for the future—a future that will surely bring new methods of extracting ore in more environmentally-friendly methods. Further, we have to have a complete water study and plan of this area of the Coronado Forest before any decisions are made that will disturb and pump large amounts of groundwater. Further, there must be large deposits of metals that have not been explored in the many areas of wasteland in the Southwest. These areas such as the Rosemont mine were found by small mining operators with picks and shovels—854 of them. Expert mining surveyors can find deposits away from these traditional areas. Alternative methods being tried now: BHP was experimenting with ways to extract copper without disturbing the environment—in a cotton field (probably for oxide ores only): Economic Consequences: Tourism is worth billions annually into our state. In the long term, tourism brings more money into Arizona than mining, and the money stays here. The profits do not fly out to corporate executives and stock holders around the country—and Canada in this case. [The Phelps Dodge CEO pulled in $4.3 million in 2005 in salary, bonuses and perks.] The Arizona Chamber of Commerce lists tourism as one of the top seven industry opportunities; mining was not on their list. Statistics taken from Arizona Office of Tourism Report for 2005 (page 35): Travel Spending Related Travel-Generated Impacts Total Visitor Earnings Employment Local Taxes State Taxes TOTAL ($Million) ($Million) ($Million) (jobs) ($Million) ($Million) ($Million) 2,198.3 2,170.0 543.8 25,550 47.2 82.3 129.5 Many people visit Tucson because of its exceptional natural beauty, wonderful mountains, and great climate in the winter. If this beauty is degraded by mining development and pollution, Pima County has five major mines (two now closed) scarring the landscape, and all are outside of the National Forest area. I would think that Pima County has given its share to the copper market. Industrial taxes versus property taxes: That area of Pima County is being built up with high cost homes, whose owners will be paying property taxes for some 100 years while making improvements on their property. The mining company will be paying taxes for 20 years and devastating 4,000 acres and making the surrounding area a maze of noise, traffic and dust. What will the property values of that region of Pima County be worth then? Do the numbers. Taxpayers always lose out with mining operations, even if the mine reclaims the land. State Trust Land Revenue: There will be a small revenue from mining of State Trust Land. Asarco Mission Mine complex has paid a large revenue—millions of dollars—into the supposed “educational fund” over the past 25 years or so. Thousands of acres of land are sold to builders at top prices in Phoenix. Yet, Arizona school system is one of the poorest. Where does that money really go? Water Depletion: Further, the preservation of this Forest Service land is in line with two resolutions adopted by the Pima County Board of Supervisors. They adopted the Sonoran Desert Conservation Plan, which received the American Planning Association's 2002 Outstanding Planning Award. Last year, in a 5-0 vote, the Supervisors passed a resolution in favor of a strong Endangered Species Act. The Arizona Water Resources Agency keeps some records, but less in outlying areas. I have their well inventory and water depth CD, but I can find no wells in that region. However, if you were to contact them directly, they might be able to give you some idea of the groundwater level in that area and the rate of depletion in the past 20 years or so. (Ken Seasholes, manager Tucson AMA, phone: 770-3814) The combined municipal use of the communities of Green Valley and Sahuarita is 3,800 acre feet per year. Therefore, 5,000 to 8,000 acre feet is the water to supply some 60,000 to 80,000 homes minimum. Does southern Pima County have that water to lose to industrial waste and devastation? Frankly, I do not comprehend why the water authorities are asking residents to get rid of their lawns while at they same time they are doling out such large quantities of water to industry. The use of CAP credits means that water is pumped in one place and recharged in another. There are only two places to recharge CAP water in Pima County: Avra Valley and Pima Mine Road. CAP water credits can be recharged legally at either place for the Rosemont Mine use. On the water use in Augusta Operations Plan, pg. vi, it clearly states that’s what they intend to do. (Note the term “ on a regional scale”—they know what they are doing .) Water supply . Central Arizona Project (CAP) water is available for use by the Rosemont Project. However, the current source of CAP water is approximately 18 miles northwest of the project, near Pima Mine Road and Interstate-19. Cost for transport of CAP water to the Project would be large, requiring approximately 18 miles of pipeline and rights-of-way. In addition, availability of CAP water is subject to interruption from planned maintenance outages and unplanned emergency outages along the CAP aqueduct. The project proponent has contracted to utilize CAP water as an indirect source of water. By contracting for and purchasing CAP water in an amount equivalent to that used at the mine, the project proponent plans to recharge CAP water to the regional aquifer at other locations in the upper Santa Cruz basin. Recharge of CAP water at an established groundwater recharge facility in the upper Santa Cruz basin will offset the potential impact of groundwater withdrawal on a regional scale. Orignally, recharge was to be 10 miles away at Pima Mine Road; however, the site has been changed to Marana, some 30 miles away. At the Board of Supervisors Meeting on Tuesday, Sept. 5, I brought up the problem of “pumping here” and “recharging there.” Afterwards, County Manager, Chuck Huckleberry, said that groundwater pumping would not be allowed, and added there would not be any paper water (that’s what they call this “recharge away from use” project). In any case, pumping will have to occur to dewater the pit. A good article on dewatering. The official name is “Groundwater Replenishment District.” It was meant to allow building in certain cases when water was deficient, but has been expanded and used in a myriad of approaches that was not the original intent. The crux of the matter is that Assured Safe Yield by 2025 for an AMA is the overall average for region—so one area can be up and another can be down—it’s the overall water balance. I’m attaching the map of the Tucson AMA, showing that Green Valley will be 150 feet down, but the Tucson AMA will still show “safe yield” because there will be mounds of water at the two CAP recharge stations. Even though the Tucson area is known for subsidence and earth fissures (south of Tucson), this practice is continued. See page 2 of Arizona Water Resources Report. Historically, water levels have declined considerably in this general area due to mining. We have graphs showing lowering of groundwater in the area of mining, both at Twin Buttes and Sierrita. Note that the data is old because this type of work was only done in the early 1980’s after F.I.C.O. sued the mines because of their heavy use of water and contamination causing high salt/hardness content. The report is “Ground-water Monitoring in the Tucson Copper Mining District,” prepared by Pima Association of Governments and Upper Santa Cruz Basin Mines Task Force (created only for this study). The report, published in 1983 is the best analysis we have of mining in the area (maybe in the whole southwest!). Unfortunately, although recommendations were made, they were never followed up on. Twenty years later when PAG did a follow-up report, they did not even include any data from Duval/Sierrita mine because the company did not cooperate. The report is available from Pima Association of Governments (792-1093). Further, here in Green Valley, there is an annual drawdown of 2 to 3 feet per year. Water rights for mining for our local mining company were obtained by buying up agricultural land. The result is that the community is sustaining a 31,000 acre feet annual deficit, and signs of subsidence are beginning to appear: cracking in walls of homes, sidewalks and roads. Map of the projected water levels in 2025 in Pima County, which may reach “safe-yield, but Green Valley will not—it’s upstream, not a good omen for downstream. One area that is rarely considered is the fuel consumption of the mining industry. The mining of metals is one of the most energy intensive industries in the world, consuming up to 10 percent of global energy production annually. In the United States alone, the mining industry uses 2.3 quadrillion (2,300,000,000,000,000) BTUs of energy per year. That is enough energy to supply over 25 million single family households in the United States for an entire year. Again, energy production in this area uses large amounts of water. Assuming that this area has plenty of power to provide electricity to another mine, power lines and substations will surely create another scar across the landscape. The plan (page 20) includes a section on power lines and substations: Estimates of peak demand and energy for the project indicate a peak load ranging from 80 megawatts (MW) to 100 MW and approximately 500 GWh to 700 GWh of annual energy requirements. It is currently anticipated that power for the project will be acquired from Tucson Electric Power (TEP), TRICO Electric Cooperative (TRICO), and/or a third party. It is also anticipated that the purchased power will be delivered over the TEP system or the Southwest Transmission Cooperative (SWTC) system to an interconnection point with project-owned transmission facilities. Trucks/Traffic CongestionAll supplies, including sulfuric acid and toxic volatile organic chemicals, will be trucked in daily. Further, to calculate the daily loads of copper taken out on the road in 10 ton trucks. Sulfide Ore at .6 % of 27,000,000 tons = 162,000 tons of copper per year = 450 tons per day, that is, forty-five 10-ton truck loads. However, the concentrate is at best 50% copper—so twice that amount is ninety 10-ton truck loads per day. In addition, there is 10,000,000 tons of oxide ore per year. We do not have the percentage of copper in this oxide ore to calculate the number of additional truck loads to carry out the copper wafers. Dry Tailings versus Wet Tailings: Such an experiment should be done with small projects. In Rosemont there is a projected 1 billion tons of waste rock and slurry. Slurry is put through pipes for ease of handling. If it is thickened further, making it sludege, it would have to be hauled in trucks—like cement trucks. How many trucks would that take and how would they be able to climb to the top of a billion acre pile to dump the sludge? Augusta has not given us the practical details. At this point, Augusta is on a "we'll figure it out as we go along" mode. "Not in our national forest!" is my continual plea. One point to consider: Are there any native plants that can survive on the composition of this particular slurry paste? The composition of the Sierrita tailings slurry, which is thickened to some degree. Dam Construction: This concept needs to be investigated thoroughly. Impoundment dams are a complicated engineering feat, for which volumes of books have been written. Tailings dams do fail, and they are not even inspected for safety in Arizona (a gift of our enlightened legislators since 1977). This area is a mountainous region where there is a potential for earthquakes, and tailings dams must be engineered to hold back their sludge forever. The 1877 earthquake changed the landscape from the Santa Cruz River to the Chiriquawa mountains. The concept developed for this plan involves placement and compaction of waste rock in an engineered berm in the lower portion of the waste rock deposition area to provide a dry tailings buttress. This concept is a red flag. Where has been implemented with success? Our forest is not the place for some new innovation that has not specifically tested successfully over a long period of time. Frankly, this is the area that I am least informed on—but EPA includes it in their website: Toxic metals in waste rock and tailings: Waste rock itself can be acid producing. Build-up of Sulfates is an inevitable side effect of milling and concentrating sulfide ore. From looking at the Sierrita tailings, it’s doubtful anything could grow there. Waste rock piles that have been standing for years at Twin Buttes have very little growth on them. How Deep Does It Get! Seven hundred and fifty million tons—759,300,000 tons—of waste rock will be deposited on 3,155 acres of forest land in 16 years. Mining not only removes mountains, it creates them. And Augusta claims that it is just going to tuck the waste rock into the landscape where it won’t be noticed! They will use 350 ton trucks to move the ore to the mill, which means 250 truck loads per day grinding from the pits to the mill. There will be just over 26 million tons of tailings dumped annually in impoundments. Over the 16 years, this adds up to a total of 419,000,000 tons of white mineral laden paste for our “rock garden.” Both waste rock and tailings gives a grand total of 1,188,211,000 tons to be spread over 3,155 acres of Coronado National Forest land. So we will have over 1 billion tons of waste rock and tailings—almost 376 million tons per acre. This gives us a grand total of 173 cubic feet of waste per square foot of land. That means 173 feet high of useless waste rock and tailings—if spread on every inch of allotted forest land will be equivalent to a 17-story building. And they are telling us their operations will be “environmentally sound and protective of the environment.” With a toxic lake and waste piled 173 feet deep—there will be no environment to protect! Chemicals used in the flotation and thickening processing of copper: This Flotation process is the major extraction method where there is poor quality of the ore. Xanthate chemicals produce bubbles that that the copper adheres to and the "bad stuff" falls to the bottom. These chemicals used for flotation are hydrocarbons with complex configurations, but some are as simple as kerosene. It is claimed that the volatile organics used in the Flotation Process do not go into the slurry that goes into the tailings impoundment because they are filtered out before the slurry goes to the impoundment. This is not a sound analysis. 1) Filtration is not a treatment technology for volatile organics. Treatment is pushing air the solution which releases the volatile chemicals into the air [Bless the employees who would endure this environment.] 2) Some are amine compounds that break down into nitrates, so the presence of nitrates in the groundwater is an indicator of travel of these compounds, which can be very mobile in an oxygen solution (H 2O). The tailings slurry water has a Nitrate level of 18.6 mg/ltr. On site monitor well BW-2 has a level of 97.5, while monitor wells at the dam, MH-14 and MH-16, show levels of 12.8 and13.2, respectively. Some of the Chemicals Used in Flotation Process and in the Thickening Process that takes the water out of the used slurry (I can fax you the fact sheets for these chemicals):
Pits become toxic lakes that are harmful to wild life and not consistent with a recreational area: The Forest Service has written a report on the flooding by groundwater of open-pit mines in several abandoned mines in Region 6 pit lake. Water quality in these pit lakes varies from highly acidic to alkaline. www.fws.gov/pacific/ecoservices/envicon/pim/reports/Reno/PitMines.htm The Berkeley Pit in Butte, Montana is a 1.5 square mile open pit approximately 1,700 feet in depth. Ground water has infiltrated the open pit and created a pit lake about 710 feet in depth containing 30 billion gallons of water with a pH of 2.5. Birds landing in these acidic pit lakes can ingest this water which causes severe trauma to their gastrointestinal tracts and eventual death. The acidic water also removes natural oils from the birds’ feathers causing them to die by drowning or hypothermia. In 1995, the Berkeley Pit proved lethal to over 300 snow geese which used the pit lake as a migratory stopping place. Abandoned open pit uranium mines in Wyoming also have formed pit lakes. This is relevant, uranium has been mined in Pima County at the Twin Buttes mine; therefore; uranium could be present in the waste rock in Rosemont area. Uranium-bearing formations are usually associated with strata containing high concentrations of selenium. Pit lakes formed in open pit uranium mines can contain very high levels of selenium in the water. One pit lake in Wyoming contains over 100 parts per million (microgram per Liter [µg/L]) of selenium. Waterborne selenium concentrations greater than 2µg/L are known to impair the reproduction and survival of aquatic birds due to the high potential for dietary toxicity through food chain bioaccumulation. Sulfates and TDS: Monitor wells in mill area Radiochems: Monitor Well BW-3 in mill area Sulfuric Acid Leaching Processing: Sulfuric acid is brought in on railroad tankers at Sierrita, and ore and cooper are moved out on railroad cars. Railroads are essential to copper mining. Actually, we have copper mining to thank for our railroad system in Arizona. How will the sulfuric acid, ore for smeltetering, and copper from electrowinning be transported out of this area? How many trucks will it take to haul the stuff back and forth? Content of sulfuric acid leach ponds at Sierrita The leach sulfuric acid is maintained in large open ponds and is subject to spills and overflows. Here are some records from several Pima County mines. Hazardous Material Incident Sierrita Hazardous Material Incident Silverbell According to the experts: “Leach pad sites are generally selected for their combination of geotechnical and economic considerations. Sites with large settlement potential or slope stability problems are usually avoided. However, copper leach pads can be enormous, reaching areas in excess of 5 million square meters. This often precludes selection of the optimum site from a geotechnical standpoint. It also can require a liner system to span a wide range of geologic profiles. “Differential settlement typically results from one of three causes: the liner spans soils of differing compressibility, the slope and height of the heap are extreme, or local settlement results from leaks in the liner. The later cause can be significant where the soils contain high concentrations of acid soluble salts such as in northern Chile.” Dynamiting and Noise Pollution: I suppose the animals will adjust—they seem to be very forgiving. Wouldn’t it be great if they could speak up as stakeholders? Dark Sky Regulations: In January of 1995, a fatality occurred at a waste rock dump area at the Sierrita mine site in nearby Green Valley, then owned by Cyprus Corporation. A Caterpillar dump truck backed over a berm, and turned over, fatally injuring the driver. There was no illumination provided at the dump area. The truck was equipped with two back-up lights that were quite dirty. The Labor Board investigated and required that portable lighting plants be installed at all dumping areas to provide sufficient illumination for safe dumping operations. Reclamation: Often, the land is so scarred that nothing can be grown or reclaimed for years. The ancient Romans had metallic sulfide mines that still leach sulfuric acid into the areas. I say show me one of these large pit mines that has been returned to any level of its previous condition.
|